2005-12-07
Trackwork continues
I finally got some more trackwork done. I completed the curve coming off the upper left of the crossing section all the way around to the next turnout. Then I completed the upper industrial siding and placed the turnout for the lower industrial siding. A few more pieces of flextrack and I should have enough track laid to make some decent test runs.
I also decided that I would replace the gravel pit with a large industry. I got the idea from an old CD case I had laying around. I think the CD case is probably too big, but I could scratch build something out of styrene or find a kit that would be the right size.
I'm most concerned now over the 2nd level of the layout. I still don't have a real plan as to how I am going to handle it.
I also decided that I would replace the gravel pit with a large industry. I got the idea from an old CD case I had laying around. I think the CD case is probably too big, but I could scratch build something out of styrene or find a kit that would be the right size.
I'm most concerned now over the 2nd level of the layout. I still don't have a real plan as to how I am going to handle it.